PLEASE NOTE: ALL FILL PORTS ARE PRE-ORDERED.
LEAD TIME IS 8 TO 12 WEEKS...!
UPDATE: WE HAVE FIXED THE THREAD PULL PROBLEM, AND PRODUCTION WILL RESTART LATE THIS WEEK, AND AND ALL ORDERS WILL BE FILLED AS SOON AS POSSIBLE.!
THANK YOU FOR YOUR UNDERSTANDING.
THE PHOTO IS A RENDERING OF THE CAD DRAWING, AND TWO ACTUAL PHOTOS.
PLEASE REMEMBER ALL ORDERS ARE FIRST IN FIRST OUT, AND IF YOU PLACE AN ORDER, THERE ARE ORDERS AHEAD OF YOU, AND ORDERS BEHIND YOU.
THERE ARE CUSTOMER THAT WERE SHIPPED THE OTHER DESIGN AND ABOUT HALF OF THEM ENDED WITH THE PRESSURE GAUGE IN AN UNDESIRED LOCATION, THIS HAPPENS AS THE THREADS ON THE AIRTUBE DO NOT START IN THE SAME PLACE, ON ANY TWO K1's,
IT HAS TAKEN A LONG TIME TO FIGURE OUT HOW TO CORRECT THIS PROBLEM, WELL I HAVE FIGURED IT OUT AND READY TO START PRODUCTION.
THE PARTS ARE MADE OUT OF 6061 T-6 ALUMINUM AND ARE MACHINED MANUALLY ON A LATHE AND MILL, EACH COMPLETE FILL PORT TAKES 18,5 HOURS, PROVIDED NO PROBLEMS ARISE.
THE NEW 2 PIECE DESIGN ELIMINATES THE PROBLEM OF THE LOCATION OF THE PRESSURE GAUGE.
THIS WILL ALLOW YOU TO PUT THE PRESSURE GAUGE AND FOSTER FILL PORT ANY POSITION YOU WANT IT, YOU HAVE ABOUT 345 DEGREES ON YOUR K1 AIR RIFLE TO CHOOSE FROM, THE ONLY PLACE YOU CANNOT PLACE IT, IS FACING UP UNDER THE BARREL TUBE.!
THE PARTS ARE ANODIZED AND FINISHED IN A SEMI GLOSS BLACK THEN SEALED.